Past Project

Past ProjectOwnerScope or WorksClientYear
MLNGTrain9 Petronas, Bintulu7,000 Dia inch piping site installation, hydro test, hydraulic controlled bolt tensioning& hydraulic controlled bolt torque tighteningPROFMECHFeb 2015 - Sep2015
MLNGTrain9 Petronas, BintuluHydraulic controlled bolt tensioning
and hydraulic controlled bolt torque
tightening
PECApr 2015 - Aug 2015
MLNGTrain9 Petronas, BintuluHydraulic controlled bolt
tensioning for critical flare
line
DIALOGMay 2015 - July 2015
SAMURPetronasHydraulic controlled bolt tensioning &
hydraulic controlled bolt torque
tightening during construction installation
PIONEER HEAT TREATMENTMar 2016 - May 2017
Tank 7Petronas15,000 Dia inch of stainless steel pipe
shop fabrication, site installation,
flange management and N2
pneumatic test.
BMECHApr 2016 - Nov 2016
SAPA-WIMURPHY OIL
CORPORATION
SAPA WATER INJECTION
platform and steel
structure fabrication
BMECHApr 2017 - July 2017
P-14 Utilities &
Interconnecting
PetronasHydraulic controlled bolt
tensioning and hydraulic
controlled bolt torque tightening.
CN ELECOMay 2018 - Sep 2018
P-14 Utilities &
Interconnecting
Petronas120 Pax manpower supply for
hydrotest, punch killing, machanical
hot work, flange management,
flange surface machining
PIONEER HEAT TREATMENTMay 2018 - Dec 2019
ARKEMA K2ARKEMA
THIOCHEMICALS
Total 100 Pax of welder, fitter,
foreman, supervisor supply
for jacketed pipe site installation
and hydrotest
TECHNIP FMCApr 2019-
Nov 2019
SAMURPetronasHydraulic controlled bolt tensioning,
hydraulic controlled bolt torque,
Flange management for warranty shutdown
PIONEER HEAT
TREATMENT
June 2019 - Aug 2019
SHUTDOWN
MAINTENANCE
SMDSHydraulic controlled torque
flange management
PECSep 2019 - Nov 2019
EURO IVHRCTFA management team &
hydraulic controlled flange
management & flange
surface machining
HQCAug 2020 -