Past Project
Past Project | Owner | Scope or Works | Client | Year |
---|---|---|---|---|
MLNGTrain9 | Petronas, Bintulu | 7,000 Dia inch piping site installation, hydro test, hydraulic controlled bolt tensioning& hydraulic controlled bolt torque tightening | PROFMECH | Feb 2015 - Sep2015 |
MLNGTrain9 | Petronas, Bintulu | Hydraulic controlled bolt tensioning and hydraulic controlled bolt torque tightening | PEC | Apr 2015 - Aug 2015 |
MLNGTrain9 | Petronas, Bintulu | Hydraulic controlled bolt tensioning for critical flare line | DIALOG | May 2015 - July 2015 |
SAMUR | Petronas | Hydraulic controlled bolt tensioning & hydraulic controlled bolt torque tightening during construction installation | PIONEER HEAT TREATMENT | Mar 2016 - May 2017 |
Tank 7 | Petronas | 15,000 Dia inch of stainless steel pipe shop fabrication, site installation, flange management and N2 pneumatic test. | BMECH | Apr 2016 - Nov 2016 |
SAPA-WI | MURPHY OIL CORPORATION | SAPA WATER INJECTION platform and steel structure fabrication | BMECH | Apr 2017 - July 2017 |
P-14 Utilities & Interconnecting | Petronas | Hydraulic controlled bolt tensioning and hydraulic controlled bolt torque tightening. | CN ELECO | May 2018 - Sep 2018 |
P-14 Utilities & Interconnecting | Petronas | 120 Pax manpower supply for hydrotest, punch killing, machanical hot work, flange management, flange surface machining | PIONEER HEAT TREATMENT | May 2018 - Dec 2019 |
ARKEMA K2 | ARKEMA THIOCHEMICALS | Total 100 Pax of welder, fitter, foreman, supervisor supply for jacketed pipe site installation and hydrotest | TECHNIP FMC | Apr 2019- Nov 2019 |
SAMUR | Petronas | Hydraulic controlled bolt tensioning, hydraulic controlled bolt torque, Flange management for warranty shutdown | PIONEER HEAT TREATMENT | June 2019 - Aug 2019 |
SHUTDOWN MAINTENANCE | SMDS | Hydraulic controlled torque flange management | PEC | Sep 2019 - Nov 2019 |
EURO IV | HRC | TFA management team & hydraulic controlled flange management & flange surface machining | HQC | Aug 2020 - |